Masmia Campus
MDCIL-2 (200)
Total Power20 MW
Size (SQM)15 K
KW per RackUp to 1MW
Tier designT3
Substation OnsiteY
Liquid Cooling Support (Y/N)Y
RFSOperational
Additional information
Within MATAM Haifa High-Tec Park, 500m from subsea cables landing point 20MW are under construction, with RFS of 10MW in 2027.